Please use this identifier to cite or link to this item: http://hdl.handle.net/10773/7537
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorFerreira, José António de Vasconcelospt
dc.contributor.authorPereira, Cláudia Manuela Almeidapt
dc.date.accessioned2012-03-27T15:42:13Z-
dc.date.available2013-07-05T13:49:40Z-
dc.date.issued2011-06-24-
dc.identifier.urihttp://hdl.handle.net/10773/7537-
dc.descriptionMestrado em Engenharia e Gestão Industrialpt
dc.description.abstractO projecto descrito neste documento visou a determinação da capacidade produtiva instalada e o seu eventual aumento na DURIT, empresa pulverometalúrgica dedicada à produção de ferramentas em metal duro. A motivação para o trabalho desenvolvido prendeu-se na necessidade de responder positivamente às exigências de prazos e quantidades associadas às encomendas de um determinado cliente, fundamental para o negócio da DURIT. As principais medidas de melhoria propostas foram: desenvolvimento de novas ferramentas de prensagem, alterações processuais em algumas sequências operatórias e, pontualmente, recorrer a trabalho extraordinário. De um modo geral os objectivos traçados foram cumpridos, mas alguns prazos de entrega ficaram aquém das necessidades. As causas detectadas foram várias mas, as mais determinantes foram o elevado mix de produtos em curso na DURIT a competir pelos mesmos centros de trabalho e os factores humanos que se encontram sempre associados a qualquer tomada de decisão. A metodologia deste trabalho, bem como algumas considerações que durante a sua realização foram levantadas, poderão auxiliar na melhor programação de futuras encomendas.pt
dc.description.abstractThe Project described in this document pretends to determine the installed productivity capacity and its possible increase in DURIT, a hardmetal tools producer company. The motivation for this work was the need to respond to the quantities and delivered date of the demands of a very important client for the DURIT business. The principal improvements proposed were the development of new tolls for the pressing operation, changes in some operations sequences and, in some cases, make extraordinary work. Overall the targets set were met but some deadlines have fallen. The causes identified were, essentially, the high mix of products being in DURIT that competes with the same work centers and human factors that are always associated with any decision or action. The methodology of this study and some considerations used in its implementation may assist in better planning of future orders.pt
dc.language.isoporpt
dc.publisherUniversidade de Aveiropt
dc.rightsopenAccesspor
dc.subjectGestão industrialpt
dc.subjectGestão da produçãopt
dc.subjectIndústria metalúrgica - Estudos de caso - Aveiro (Portugal)pt
dc.titleAvaliação e melhoria de capacidade produtiva numa empresa metalúrgicapt
dc.typemasterThesispt
thesis.degree.levelmestradopt
thesis.degree.grantorUniversidade de Aveiropt
Appears in Collections:UA - Dissertações de mestrado
DEGEIT - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
244360.pdf3.02 MBAdobe PDFView/Open


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.