Please use this identifier to cite or link to this item: http://hdl.handle.net/10773/14408
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorAnselmo, Eduardopt
dc.contributor.advisorAlmeida, Fernandopt
dc.contributor.authorMatinhas, Carla Sofia Pereirapt
dc.date.accessioned2015-07-15T13:31:43Z-
dc.date.available2015-07-15T13:31:43Z-
dc.date.issued2014-
dc.identifier.urihttp://hdl.handle.net/10773/14408-
dc.descriptionMestrado em Engenharia Geológicapt
dc.description.abstractEsta dissertação foi fruto do trabalho desenvolvido durante um estágio curricular na empresa Captágua - Captações de Água Lda, que possibilitou à estagiária participar ativamente no dia-a-dia da empresa. A principal atividade da empresa em questão é a captação de águas subterrâneas. Por esse motivo, o primeiro objetivo de trabalho foi o acompanhamento de obra, adquirindo conhecimentos sobre todos os procedimentos envolvidos numa obra deste género (captação de águas subterrâneas), conhecendo todos os métodos de perfuração utilizados (por rotação ou rotopercussão) e em que situações se aplicam. Devido à aquisição recente pela empresa de um equipamento de resistividade elétrica, surgiu mais um objetivo de trabalho, que foi o desenvolvimento e a implementação da metodologia, ou seja, desde o estudo do equipamento e de todas as suas funcionalidades até á aplicação do equipamento num caso de estudo em concreto (Fontão). Também foram realizados testes (pseudosecções) em locais com diferentes geologias/ diferentes resistividades (desde baixas a altas) e foram tiradas conclusões relativamente ao modo de funcionamento do equipamento em cada situação.pt
dc.description.abstractThis thesis presents the work carried out during a curricular internship in Captágua - Captações de Água Lda, which allowed to the intern to participate actively in everyday life of the company. The main activity of the company is the installation of groundwater extraction wells. For this reason, the first objective was acquiring knowledge about all the procedures involved in well design and installation tasks, knowing all drilling methods used (rotary or rotopercurssion drilling techniques) and the different scenarios to be applied. Due to the recent acquisition electrical resistivity equipment by Captágua, a new task was added in the internship program, which was the development of the methodology and the implementation of this new equipment, and the application to the Fontão case study. Pseudo-section tests were also conducted in different locations with different geologies/resistivity (from low to high) and conclusion were taken about the equipment operating mode in each scenario.pt
dc.language.isoporpt
dc.publisherUniversidade de Aveiropt
dc.rightsopenAccesspor
dc.subjectEngenharia geológicapt
dc.subjectÁguas subterrâneaspt
dc.subjectAquíferospt
dc.subjectPerfuração de poçospt
dc.subject.otherCaptação de águas subterrâneaspt
dc.subject.otherAquíferopt
dc.subject.otherGeofísicapt
dc.subject.otherPseudo-secçãopt
dc.titleObras de captação de águas subterrâneas e testes geoelétricos de aquisição com um resistivimetro WDA-1pt
dc.typemasterThesispt
thesis.degree.levelmestradopt
thesis.degree.grantorUniversidade de Aveiropt
dc.identifier.tid201568535-
Appears in Collections:UA - Dissertações de mestrado
DGeo - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
Tese.pdf10.79 MBAdobe PDFView/Open


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.