Please use this identifier to cite or link to this item: http://hdl.handle.net/10773/17401
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorVicente, Romeu da Silvapt
dc.contributor.advisorDuarte, Helderpt
dc.contributor.authorFartaria, Francisca Jorgept
dc.date.accessioned2017-05-11T12:17:04Z-
dc.date.available2017-05-11T12:17:04Z-
dc.date.issued2016-
dc.identifier.urihttp://hdl.handle.net/10773/17401-
dc.descriptionMestrado em Engenharia Civilpt
dc.description.abstractO presente documento tem como finalidade descrever o acompanhamento de duas obras realizado na empresa Cari Construtores, S.A. durante um período de 10 meses, com a supervisão do Engenheiro Helder Duarte. Este relatório encontra-se dividido em 5 capítulos onde cada um deles representa as várias fases do estágio. Inicialmente, no capítulo 1, é feita uma breve introdução à empresa e à organização do relatório. No capítulo 2 são referidos os conceitos essenciais para a correta direção e gestão de obras de reabilitação e reconstrução, bem como os procedimentos essenciais a executar no decorrer da empreitada. Relativamente aos capítulos 3 e 4, estes representam a descrição das obras de reconstrução de um hotel e reabilitação de um edifício na baixa pombalina, respetivamente. No que respeita ao capítulo 5, este apresenta a aprendizagem pessoal ao longo do período de estágio e conclusões finais de cada uma das obras. Por fim, está apresentado em anexos o trabalho e aprendizagem desenvolvida ao longo do estágio, informação complementar do Hotel Castromira e behotelisboa e um relatório fotográfico de forma a proporcionar uma melhor perceção das várias fases das duas empreitadas.pt
dc.description.abstractThe aim of the current document is to describe a sequel of 2 constructions performed by the Cari Contrutores, S.A. Company, for 10 months, under supervision of the Engineer Helder Duarte. This dissertation is divided into five chapters, each one representing a different stage of my internship. Initially, in chapter 1, an introduction to the Company is done, as well as to the structure of this paper. Chapter 2 introduces the main concepts for improving management and leadership in rehabilitation and reconstruction works, as well as the essential procedures to perform during an endeavour. Regarding chapters 3 and 4, the reconstruction works of a hotel and the rehabilitation of a building placed in Baixa Pombalina are discussed, respectively. Concerning chapter 5, it includes a personal learning analysis across the whole internship and conclusions are presented for both projects. Finally, it is shown in the appendixes how the work was developed, additional information of Castromira Hotel and behotelisboa and also a photographic report demonstrating how to provide a better perception of the several stages of the two endeavours.pt
dc.language.isoporpt
dc.publisherUniversidade de Aveiropt
dc.rightsopenAccesspor
dc.subjectConstrução anti-sísmica - Reabilitaçãopt
dc.subjectHotéis - Reconstrução - Lisboa (Portugal)pt
dc.subjectConstruçãopt
dc.subjectGeotecniapt
dc.subjectEdifícios antigos - Reabilitação - Lisboa (Portugal)pt
dc.subject.otherGestão de obrapt
dc.subject.otherReconstruçãopt
dc.subject.otherMonitorizaçãopt
dc.subject.otherReabilitaçãopt
dc.subject.otherGaiolas pombalinaspt
dc.titleDireção e gestão de obras de reconstrução e reabilitação: relatório de estágiopt
dc.typemasterThesispt
thesis.degree.levelmestradopt
thesis.degree.grantorUniversidade de Aveiropt
dc.identifier.tid201932938-
Appears in Collections:UA - Dissertações de mestrado
DECivil - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
Dissertação.pdf12.14 MBAdobe PDFView/Open


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.