Please use this identifier to cite or link to this item: http://hdl.handle.net/10773/27018
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorXambre, Ana Raquelpt_PT
dc.contributor.authorMaciel, Filipe Mirandapt_PT
dc.date.accessioned2019-11-23T16:43:08Z-
dc.date.issued2019-06-27-
dc.identifier.urihttp://hdl.handle.net/10773/27018-
dc.description.abstractQualquer empresa a competir no mercado global procura principalmente a obtenção de lucros. Um dos principais modos de conseguir atingir esse objetivo consiste em obter o máximo possível da sua capacidade de produção. O Norma Group, tendo adquirido a Lifial, pretende o mais rapidamente possível lucrar com o seu investimento, mas para isso, precisar de conseguir eliminar os desperdícios e ineficiências existentes na empresa por forma a esta atingir um nível de desempenho superior. Assim, este projeto teve como objetivo começar esse esforço de melhoria, consistindo na realização de um DMAIC (Define, Measure, Analyze, Improve, Control) geral de todo o sistema produtivo da Lifial. Foi, portanto, necessário definir o problema, medir o mesmo, analisá-lo, melhorá-lo e controlar a situação. A base de todo este projeto consistiu num trabalho de crono análise e mapeamento dos processos de produção, com o fim da criação de um novo plano de produção que permitiu a melhor definição e separação do trabalho na fábrica e a criação de indicadores de desempenho. No espaço de poucos meses com a utilização de este novo plano de produção foram logo visíveis algumas melhorias na empresa, entre as quais, a subida de cerca de 12% do índice PPH (peças por pessoa, por hora).pt_PT
dc.description.abstractAny company competing in this global market wants to obtain profit. One solution to achieve that goal is to fully use their production capacity. Norma Group has bought Lifial and, logically, wants some return on their investment as soon as possible. However, for this to happen, it is necessary to eliminate the existing waste and inefficiencies present in the company, so as to reach a higher level of performance. Thus, this project aimed to start this effort of improvement, with the implementation of a DMAIC (Define, Measure, Analyze, Improve, Control) study applied to the entire production system of Lifial. It was, therefore, necessary to define the problem, measure it, analyze it, improve it and control the situation. This project started with a time study and the production processes mapping, with the purpose of developing a new production plan that allowed for a better definition and separation of the work in the factory and the creation of performance indicators. In the time lapse of a few months, with the use of this new production plan, some improvements in the company were soon visible, among them, the rise of about 12% of the PPH index (pieces per person per hour).pt_PT
dc.language.isoporpt_PT
dc.rightsopenAccesspt_PT
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/pt_PT
dc.subjectLean Seis Sigmapt_PT
dc.subjectProduçãopt_PT
dc.subjectEficiênciapt_PT
dc.subjectGargalopt_PT
dc.subjectDMAICpt_PT
dc.titleAnálise e melhoria dos processos de fabricação e montagem numa indústria metalomecânicapt_PT
dc.typemasterThesispt_PT
thesis.degree.grantorUniversidade de Aveiropt_PT
dc.date.embargo2021-06-27-
dc.description.masterMestrado em Engenharia e Gestão Industrialpt_PT
Appears in Collections:UA - Dissertações de mestrado
DEGEIT - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
Documento.pdf2.24 MBAdobe PDFView/Open


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.