Utilize este identificador para referenciar este registo: http://hdl.handle.net/10773/25151
Título: Implementação do software SAM na otimização da performance de uma linha de montagem
Autor: Lemos, Leonardo Filipe Mendes
Orientador: Matias, João Carlos Oliveira
Godina, Radu
Palavras-chave: Sistemas de informação
Standard work
Gestão visual,
PDCA
Rendimento Operacional
Data de Defesa: 27-Jul-2018
Resumo: O presente relatório descreve o processo de implementação do software SAM, na linha 2 de montagem da bomba de óleo de cilindrada variável na Renault CACIA e a sua posterior utilização, para identificar os postos penalizantes e ajudar no processo de melhoria da performance. O principal objetivo do projeto para além de ser a implementação do SAM, focou-se no aumento do rendimento operacional da linha de 46% para 85%. Para tal foi necessário definir quais os indicadores a extrair do software e posteriormente criar procedimentos standards de recolha e análise de dados. De forma e expor todos os dados provenientes da análise SAM efetuada, foi fundamental criar um quadro de animação baseado no ciclo PDCA. De maneira a definir um plano de ações para atuar em conformidade com os problemas que ia surgindo, foi necessário criar um grupo de trabalho constituído por elementos de diferentes áreas. Com o auxílio da informação fornecida pelo software e graças à rigorosa monotorização que foi feita, foi possível aumentar significativamente o rendimento operacional da linha.
This report describes the implementation process of the SAM software in Line 2 of the variable displacement oil pump in Renault CACIA and its subsequent use to identify the penalizing operations and to help in the process of performance improvement. The main objective of the project, apart from being the implementation of SAM, focused on increasing the line operational efficiency from 46% to 85%. To do this, it was necessary to define the indicators to be extracted from the software and later to establish standard data collection and analysis procedures. In order to expose all the data from the SAM analysis, it was fundamental to create an animation board based on the PDCA cycle. In order to define a plan of actions to act in accordance with the problems that arose, it was necessary to create a working group constituted by elements from different areas. With the aid of the information provided by the software and due to the rigorous monitoring that was done, it was possible to significantly increase the operational efficiency of the line.
URI: http://hdl.handle.net/10773/25151
Aparece nas coleções: UA - Dissertações de mestrado
DEGEIT - Dissertações de mestrado

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
Documento.pdf4.2 MBAdobe PDFVer/Abrir


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.