Please use this identifier to cite or link to this item: http://hdl.handle.net/10773/23170
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorMoura, Ana Pinto dept
dc.contributor.authorDelgado, Luís Henrique Baptistapt
dc.date.accessioned2018-05-17T09:36:05Z-
dc.date.available2018-05-17T09:36:05Z-
dc.date.issued2017-
dc.identifier.urihttp://hdl.handle.net/10773/23170-
dc.descriptionMestrado em Engenharia e Gestão Industrialpt
dc.description.abstractEste trabalho baseia-se sobretudo nas áreas de Métodos e Tempos Pré-Determinados e Simulação. Através dos seus conceitos e metodologias pretende-se otimizar a linha de montagem de bombas de óleo de débito variável de forma a responder a um aumento de capacidade e reduzir custos associados. Durante o desenvolvimento deste trabalho foi realizado um estudo aprofundado e meticuloso à linha de montagem de bombas de óleo onde foram contabilizadas todas as atividades efetuadas pelos operadores. Foram utilizadas como ferramentas de apoio o Software SYSTEMPS para elaborar estudos de tempos e o Software Arena® para testar o funcionamento da linha de montagem com a implementação dos novos meios. Através deste estudo foram propostas algumas soluções tendo-se verificado melhorias significativas. O custo de mão-de-obra por peça foi reduzido em 2% e foi possível atingir a cadência de linha desejada isto é 44 Cmin (Centésimos de minuto).pt
dc.description.abstractThis work is mainly based on the areas of methods and pre-determined time and simulation. Through its concepts and methodologies it is intended to optimize the oil pump assembly line of variable speed in order to respond to an increase in capacity and reduce associated costs During the development of this work, an in-depth and meticulous study was carried out on the oil pump assembly line where all the activities carried out by the operators were accounted for. SYSTEMPS Software was used as a support tool to prepare time studies and Arena® Software to test the assembly line operation with the implementation of new means. Through this study, some solutions were proposed, with significant improvements. The cost of labor per piece was reduced by 2% and it was possible to reach the desired line rate of 44 Cmin (Hundredth of a minute).pt
dc.language.isoporpt
dc.publisherUniversidade de Aveiropt
dc.rightsopenAccesspor
dc.subjectIndústria automóvelpt
dc.subjectLinhas de montagem - Sistemas de controlopt
dc.subject.otherMODAPTSpt
dc.subject.otherSimulaçãopt
dc.subject.otherPMTSspt
dc.subject.otherMedição do Trabalhopt
dc.titleAnálise e simulação de uma linha de montagem no sector autómovelpt
dc.typemasterThesispt
thesis.degree.levelmestradopt
thesis.degree.grantorUniversidade de Aveiropt
dc.identifier.tid201939355-
Appears in Collections:UA - Dissertações de mestrado
DEGEIT - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
Dissertação.pdf6.26 MBAdobe PDFView/Open


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.