Please use this identifier to cite or link to this item: http://hdl.handle.net/10773/1588
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorRosa, Maria João Machado Pires dapor
dc.contributor.authorRodrigues, Isa Daniela Santospor
dc.coverage.spatialAveiropor
dc.date.accessioned2011-04-19T13:43:46Z-
dc.date.available2011-04-19T13:43:46Z-
dc.date.issued2008por
dc.identifier.urihttp://hdl.handle.net/10773/1588-
dc.descriptionMestrado em Engenharia e Gestão Industrialpor
dc.description.abstractO presente trabalho de projecto foi elaborado tendo por base o estágio curricular realizado na empresa CIRES, S.A, empresa produtora de PVC. No relatório escrito subjacente ao trabalho de projecto desenvolvido é feita inicialmente uma apresentação da empresa no qual o trabalho foi realizado, incluindo as instalações fabris actuais, os processos de fabrico do PVC, as linhas de produção e a organização interna, de maneira a contextualizar o objecto de estudo. O projecto incidiu na análise e melhoria de uma linha de produção, tendo por base um estudo de produtividade. Para tal procedeu-se a uma revisão da literatura direccionada para os sistemas de produção, a produção de PVC e o conceito de produtividade. Adicionalmente foi identificado um conjunto alargado de indicadores de produtividade. O estudo realizado centrou-se na linha PS1, e na área de polimerização, uma vez que se trata de uma área em que toda e qualquer paragem ou problema interfere no bom funcionamento de toda a linha e na qualidade do PVC produzido. O estudo baseou-se na informação existente numa base de dados construída em Lotus Notes pelo Departamento de Informática e Automação, que tinha como objectivo registrar tempos para as diversas sequências da produção de PVC, de forma a posteriormente ser realizado um estudo de produtividade. Para a construção desta base de dados foi fundamental realizar um levantamento das possíveis causas dos atrasos nas sequências. Com o decorrer do funcionamento da base de dados concluiu-se que a maior percentagem de causas para os atrasos ocorreu nas sequências DGS e DSC. No final deste estudo foi possível estabelecer um conjunto de conclusões quanto às perdas de produtividade mais significativas da linha PS1 e suas causas, sugerindo-se possíveis acções de melhoria, muitas delas visando a alteração de comportamentos. ABSTRACT: The present project was conducted during the curricular internship that took place at CIRES, S.A., a PVC producer company. The written report produced to account for the project work starts with a presentation of the company in which it was developed, including its manufacturing facilities, the processes of PVC production, the production lines and the internal organization, in order to contextualize the study object. The main goal of this project is the analysis and improvement of a production line, on the basis of a productivity study. In order to achieve it a revision of the literature was made, directed towards themes such as production systems, PVC production and the productivity concept. Additionally a set of productivity indicators was identified. The project focus is the PS1 line, more specifically the polymerization area, once it is a critical area where each and every problem or stop interferes in the smooth functioning of the entire line and on the quality of the produced PVC. The productivity study was based on the information existent in a data base built in Lotus Notes by the Department of Information Technology and Automation of the CIRES company, which allows to record times for the various sequences existent in the PVC production. For the database design it was essential to identify the possible causes for delays in the production sequences. The use of the database information allowed concluding that the highest percentage of causes for delays occurred for the DGS and DSC sequences. The work done under this project allowed to establish a set of conclusions about the most significant losses in productivity in the PS1 line as well as on the main causes for that, being possible to suggest measures to improve the productivity of this PVC production line, many of them aiming at a change in behaviour.por
dc.language.isoporpor
dc.publisherUniversidade de Aveiropor
dc.relation.urihttp://opac.ua.pt/F?func=find-b&find_code=SYS&request=000220633por
dc.rightsopenAccesspor
dc.subjectGestão industrialpor
dc.subjectEstratégia empresarialpor
dc.subjectEficácia das organizaçõespor
dc.subjectEficiência industrialpor
dc.subjectGestão da produçãopor
dc.titleLinha de produção de PVC : um estudo de produtividadepor
dc.typemasterThesispor
thesis.degree.levelMestradopor
thesis.degree.grantorUniversidade de Aveiropor
Appears in Collections:UA - Dissertações de mestrado
DEGEIT - Dissertações de mestrado

Files in This Item:
File Description SizeFormat 
2008001742.pdf1.06 MBAdobe PDFView/Open


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.