Please use this identifier to cite or link to this item:
http://hdl.handle.net/10773/11866
Title: | D8.1. Report on overall sites infrastructure preparation |
Author: | Larat, Emmanuel Delrot, Pascal Avotins, Ansis Alves, Luis Nero |
Keywords: | Projecto LITES CIP-ICT-PSP 238916 |
Issue Date: | 5-Feb-2014 |
Abstract: | The objective of work package WP8 is to ensure a timely preparation and availability of the infrastructures of pilot sites in order to allow the installation of the LITES system. Preparation of the infrastructures is own financing and consequently doesn’t request EC funding. An other objective is to ensure the coordination for a correct and timely implementation and putting into service of the pilot projects. Each pilot site should name a person responsible for local follow-up. Each responsible will report to the overall follow-up. This Deliverable is dedicated for Task 8.1. “Overall follow-up of preparation and installation” and Task 8.2 “Local coordination on infrastructures preparation”. |
Peer review: | yes |
URI: | http://hdl.handle.net/10773/11866 |
Appears in Collections: | DETI - Relatórios |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Deliverable_D8.1_Report_on_overall_sites_infrastructure_preparation.pdf | 3.06 MB | Adobe PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.