Please use this identifier to cite or link to this item: http://hdl.handle.net/10773/11861
Title: D3.2. Specifications & requirements for sites infrastructure
Author: Larat, Emmanuel
Avotins, Ansis
Alves, Luis Nero
Zissis, Georges
Kapenieks, Atis
Kapenieks, Janis
Zuga, Bruno
Keywords: Projecto LITES CIP-ICT-PSP 238916
Issue Date: 31-Jan-2013
Abstract: This document describes work that has been accomplished in Deliverable 3.2. in WP3 of the LITES project (Grant agreement no. 238916). The LITES project was started in December 2009, and after prolongation its duration is 60 months (including 10 months suspension period) . This Deliverable is part of Task 3.1. “On - site qualification of pilots”. The objective of this task is to collect local topographical data for each Pilot Site, current yearly energy consumption, and other technical data, in order to write specifications for the preparation of infrastructure of pilot sites before installing the luminaries. Write specification and requirement for pilot sites’ infrastructure preparation (noting that infrastructure preparation is under responsibility of the pilot sites and off - project budget).
Peer review: yes
URI: http://hdl.handle.net/10773/11861
Appears in Collections:DETI - Relatórios

Files in This Item:
File Description SizeFormat 
Deliverable_D3.2_Specification_and_requirement_for_sites_infrastructure_preparation.pdf2.01 MBAdobe PDFrestrictedAccess


FacebookTwitterLinkedIn
Formato BibTex MendeleyEndnote Degois 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.